Lock 2 · Design
Solution Blueprint
Turning a validated problem into a complete solution design: user journey, feature scope, and the decisions that make Lock 3 buildable instead of aspirational.
9 minute read · applies to Lock 2
A blueprint is a set of decisions, not a wish list
Lock 2 asks for the design you will actually build — which means deciding what you will not build. A blueprint that promises twelve features signals to evaluators that Lock 3 will deliver none of them well. The discipline: one core loop, executed completely.
Your core loop is the smallest sequence of user actions that delivers the value in your problem statement. For a crop-clinic app: photograph → diagnose → safe next step. Everything else — history, community, gamification — is explicitly out of scope until the loop works.
Design the user journey end to end
The failure states matter most. Solution–problem fit carries 20 points in Lock 2, and nothing demonstrates fit like showing you designed for the messy reality — low-end devices, patchy networks, uncertain model outputs — your users actually live in.
- Entry: how does the user discover and open the tool, realistically?
- First-run: what happens the very first time, with zero data?
- Core loop: the repeated action that delivers value
- Failure states: what does the user see when the model is unsure, the network is down or the input is bad?
- Exit and return: why does the user come back tomorrow?
Improvement from Lock 1 is scored — show it
Fifteen points of Lock 2 reward visible improvement from your Lock 1 feedback. Open your blueprint with a short "what changed" section: each Lock 1 recommendation, and what you did about it. Teams that engage honestly with feedback — including pushing back with reasons — consistently outperform teams that ignore it.
Plan impact measurement now, not at the end
Your blueprint should name the metric Lock 3 will demonstrate: diagnosis accuracy against expert labels, task-completion rate, time saved per case. Choosing it now shapes what you build — if the metric is follow-up completion, the product needs a way to observe follow-ups. The impact-measurement plan is worth 5 points directly, and indirectly it strengthens everything else.
Before you submit — the checklist
- One core loop defined; out-of-scope list written down
- End-to-end user journey including failure states
- A "what changed since Lock 1" section addressing every recommendation
- Feature scope honest for the Lock 3 window
- The Lock 3 impact metric named and observable in the design
Related guides
Problem Definition
How to find, narrow and evidence a problem worth three months of your team’s life — the single highest-leverag...
Lock 2 · DesignAI Architecture
Choosing models, designing pipelines and drawing the architecture diagram evaluators actually want to see — ap...
Lock 3 · ProvePrototype Development
Building a working prototype in a student-realistic window: scope ruthlessly, ship the core loop, and make "wo...